From the planning through to the construction stages our design intent has been clear; to dramatise the existing site features such as water courses and the sites rich history, whilst meeting the needs for the new community in terms of play, recreation, active travel and access to nature.
A good example of how those principles are applied is the recently opened Town Park, located at the heart of masterplan. All routes within the wider masterplan extend into the park and meet at a central plaza intended for boules and community events. A 400m circular path extending out over the existing lakes brings walkers, runners, and cyclists closer to nature.
We’re delighted to see the local boules club and walking club using the Town Park even on one of the coldest days of the year! Ultimately it’s seeing people using the spaces we have designed that bring us great joy and the reason why we love doing what we do.